Beaconsfield Traction Substation

As part of Melbourne’s ongoing rail network upgrades, the Beaconsfield Traction Substation — also known as the Beaconsfield Tie Station — plays a vital role in delivering consistent and reliable power to the Pakenham Line. Lai Group was engaged to support this essential infrastructure with the design and supply of electrical switchboards and switchrooms engineered to meet the operational demands of the rail sector.Our solutions were developed with a focus on safety, system reliability, and long-term performance—ensuring the substation supports uninterrupted power distribution across one of Melbourne’s busiest train corridors.

Key Contributions by Lai Group

  • Supply 1 of 28m x 5.4m 2h Fire Rated Switchroom
  • Supply and installation of 22kv HV Switchgear
  • Supply and installation of, Distribution boards Battery System.
  • Interconnection cabling
  • Testing and Commissioning