Adelaide Oval Redevelopment

 

Lai Group proudly played a key role in the iconic $535 million Adelaide Oval Redevelopment, having already proven our capabilities during the Western Grandstand upgrade in 2009. With a focus on delivering high-quality switchboard systems under tight timeframes, our team was entrusted with providing reliable and scalable power distribution solutions for this landmark project.

Key Contributions by Lai Group

  • 4 x 4000A Main Switchboards

  • 4 x Power Factor Correction Switchboards

  • 34 x Main Distribution Boards

  • 34 x Essential Main Distribution Boards

  • 120 x General Distribution Boards

C-Bus Control Integration

Each distribution board was designed to accommodate C-Bus control modules, pre-programmed by the electrical contractor and installed by Lai Group during manufacturing — significantly streamlining on-site commissioning and installation.

Lighting Tower Retrofit

Lai Group was also engaged to retrofit the lighting tower switchboards, integrating C-Bus controls within extremely confined spaces. The changeover was executed between cricket night games, showcasing our team’s flexibility and commitment to project delivery under live operational conditions.