Waratah Super Battery

Supporting Australia’s most powerful battery, Lai Group proudly delivered modular switchrooms and critical electrical infrastructure for the Waratah Super Battery (WSB) in New South Wales. As a landmark project in the region’s energy transformation, WSB is designed to deliver grid stability and emergency power in high-demand scenarios. Lai Group’s contribution included precision-engineered switchrooms, integrated control systems, and compliant fire-rated solutions — all built to withstand demanding operational conditions. Our work reflects a continued commitment to enabling large-scale renewable integration through dependable, future-ready infrastructure.
 

Key Contributions by Lai Group

  • Supply of 33 kV switchgear room 17.8 X 5.1 m
  • Supply of Control Building 20 x3.9 m
  • Installation of Pnaels
  • Testing and Commissioning